About the project
The study examines the development of the largely undeveloped planning unit GR-1/3 in Griže, in the Municipality of Žalec. The municipal spatial plan requires at least two development alternatives before an OPPN is prepared for the area.
An analysis of site constraints, the road network, public utilities and phasing options informed two low-density residential concepts. The preferred alternative combines a connected street network without cul-de-sacs, clearly defined development blocks and the option to prepare partial OPPNs in stages.
From existing conditions to a spatial concept
The analytical sequence uses a consistent scale and map base, making the development of the proposal legible as a series of spatial decisions.




Comparing the alternatives
Both alternatives were assessed against the same criteria. The comparison revealed differences in traffic flow, phasing flexibility and connections between parts of the area.


The alternatives and infrastructure
Both alternatives were assessed for connections to transport and public utility infrastructure. The second alternative was further refined in relation to public utilities.